CONSEQUENTIAL DAMAGES

WHAT ARE CONSEQUENTIAL DAMAGES ANYWAY?

CONSEQUENTIAL DAMAGES

We often discuss commonly used terms such as ‘indemnification’ and ‘standard of care’ when attempting to manage risk via your project contracts. There are, of course, many other provisions that must be carefully reviewed and considered as part of your risk management practices, one of which is the Consequential Damages provision. These damages can be a ‘silent killer’ if not addressed appropriately.

Unlike direct damages, which are damages that cover direct losses relating to a clear breach of contract, Consequential Damages, also known as “special damages” or “indirect damages”, are damages that flow indirectly from a breach of contract and are often related to delays in performance or completion of a project.

The potential for substantial consequential damages often results from projects that rely on profits, such as restaurants, casinos, hotels, and retail stores from which an owner will derive revenue. If the project is not completed on time, the owner will lose the benefit of that revenue and the design professional, contractor and responsible subcontractors/subconsultants can face liability for that loss of revenue, i.e., consequential damages. Further, other project participants (design professionals, contractors) can claim consequential damages resulting from the loss of subsequent work at other projects because of current project delays.

Many times, Project Owners will offer a one-sided waiver of consequential damage provision, meaning that they are the only party to receive the benefit. However, it is recommended that the provision is mutually beneficial to both the Owner and Design Professional. An example of such language is noted below:

“Neither the Client nor the Design Professional shall be liable to the other or shall make any claim for incidental, indirect or consequential damages arising out of, or connected in any way to the Project or this Agreement. This mutual waiver, includes, but is not limited to, damages or related to loss of use, loss of profits, loss of income, loss of reputation, unrealized savings or diminution of property value and shall apply to any cause of action including negligence, strict liability, breach of contract and breach of warranty.”

Please read more HERE.

Previous Post
Giving Back! PUI Adopts-A-Family for Christmas
Next Post
Benefits in a Professional Liability Policy for Architects/Engineers